Sealed bid submission checklist: 6 checks to run

CostDay Editorial Team · Posted · 10 min read

Before you submit a sealed public construction bid, check six jurisdiction-specific items on the solicitation.

Key takeaways

  • Name the solicitation and the jurisdiction before you check any bid line.
  • Start with the due time on the invitation.
  • Record the Washington training designee and provider, the Minnesota three-year period, and the Ohio responsibility status.
  • Use the awarding authority daily plan list when the solicitation is in Massachusetts.
  • Confirm withdrawal timing and bid-bond authority on a federal solicitation before you seal the package.

Sealed bid submission checklist: what to check

Start with the due time because it is the hard cutoff for a sealed bid. If the Invitation for Bids does not specify a time, bids are due at 4:30 p.m., local time, for the designated Government office on the date that bids are due, according to Acquisition.gov. This fallback applies only when the IFB is silent on the time; it does not override a time expressly stated in the IFB.

Do not treat one publisher's rule as every firm's rule, and do not treat one jurisdiction's rule as the rule everywhere. The 4:30 p.m. figure is specific to the federal provision cited on Acquisition.gov and does not establish a universal deadline for all public construction bids.

Before review: identify the solicitation and applicable provisions

Identify the specific solicitation document and the jurisdiction governing the award before checking any bid line items. In Ohio, the Revised Code distinguishes between factors used to determine whether a bid is responsive and factors used to determine whether a bidder is responsible, as outlined in Section 9.312 according to Ohio Laws and Administrative Rules.

When a responsibility determination is made, the notification route is specified in the same section. Except for contracts awarded by the department of administrative services pursuant to section 125.11 of the Revised Code, the notification shall be given in writing by an internet identifier of record associated with the bidder, or by certified mail if no internet identifier of record is available, according to Ohio Laws and Administrative Rules.

Before any final award is made, the state agency or political subdivision must either affirm or reverse its earlier determination, according to Ohio Laws and Administrative Rules. Record the status of any earlier responsibility determination in your bid file. If a prior determination exists, note whether it has been affirmed or reversed, as no final award shall be made until this action is completed. This step ensures your records reflect the current status of the agency's review process prior to contract execution.

Check your bid file for the following items before submission: * The specific solicitation number and jurisdiction. * Your current internet identifier of record. * The status of any prior responsibility determination (affirmed or reversed).

During review: bidder training and contractor verification

Identify the specific training and verification obligations that apply to your jurisdiction before sealing the bid package. The requirements differ by state and agency, so confirm which rules govern the specific solicitation.

Washington bidder training designation

In Washington, the bidder must designate a person or persons to be trained on the requirements, according to Washington State Legislature. The training must be provided by the department of labor and industries or by a training provider whose curriculum is approved by the department, according to Washington State Legislature. Record the name of the designated individual and the identity of the training provider in your bid file. Verify that the provider is either the department itself or holds an approved curriculum.

Minnesota contractor verification lookback

For covered Minnesota projects, examine the verification requirements stated in the statutes. The contractor or related entity must be in compliance with and, during the three-year period before submitting the verification, has not violated section 177.24, 177.25, 177.41 to 177.44, 181.03, 181.101, 181.13, 181.14, or 181.722, and has not violated United States Code, title 29, sections 201 to 219, or United States Code, title 40, sections 3141 to 3148, according to Minnesota Legislature Office of the Revisor of Statutes. Additionally, the contractor or related entity must be in compliance with and, during the three-year period before submitting the verification, has not violated section 181.723 or chapter 326B, according to Minnesota Legislature Office of the Revisor of Statutes.

Exclusion of earlier events

When reviewing compliance history, note that any violations, suspensions, revocations, or sanctions, as defined in clauses (2) to (5), occurring prior to July 1, 2014, shall not be considered in determining whether a contractor or related entity meets the minimum criteria, according to Minnesota Legislature Office of the Revisor of Statutes. This exclusion applies specifically to the events defined in the cited clauses.

Action step

Mark the training provider and the specific compliance lookback period on your checklist. If the solicitation is in Washington, confirm the designated trainee and provider status. If in Minnesota, verify that no reportable events occurred within the three-year window, excluding those prior to July 1, 2014, as defined.

Agency reference table for the six document checks

The table below lists the six document checks by jurisdiction, with the publisher named in each row and the specific requirement drawn from the cited source.

Check Type Publisher Key Requirement
Bidder training checks Washington State Legislature The bidder must designate a person or persons to be trained on these requirements.
Contractor verification checks Minnesota Legislature Office of the Revisor of Statutes The contractor or related entity is in compliance and, during the three-year period before submitting the verification, has not violated section 177.24, 177.25, 177.41 to 177.44, 181.03, 181.101, 181.13, 181.14, or 181.722, and has not violated United States Code, title 29, sections 201 to 219, or United States Code, title 40, sections 3141 to 3148.
Responsibility determination checks Ohio Laws and Administrative Rules Section 9.312 - Factors to determine whether bid is responsive and bidder is responsible.
Plan request record checks Massachusetts Legislature The awarding authority shall prepare and update daily a list of persons who have requested a set of plans and specifications, indicating clearly which plans and specifications or pages thereof were requested.
Submission provision checks Acquisition.gov If no time is specified in the IFB, bids are due at 4:30 p.m., local time, for the designated Government office on the date that bids are due.
Bond authority checks Acquisition.gov If the surety declares the power of attorney to have been invalid, the contracting officer shall not allow the bidder to substitute a replacement power of attorney or a replacement surety.

Verify each row against the specific solicitation documents before sealing the bid.

During review: plan records, due time and bond authority

Verify the plan request record against the daily list maintained by the awarding authority. Under General Law - Part I, Title XXI, Chapter 149, Section 44B, the awarding authority shall prepare and update daily a list of persons who have requested a set of plans and specifications, indicating clearly which plans and specifications or pages thereof were requested, according to Massachusetts Legislature. Such list shall be posted prominently at the office of the awarding authority and sent on a weekly basis to the central register published by the state secretary pursuant to section twenty of chapter nine, and such other publications as the commissioner designates, according to Massachusetts Legislature. Use this list to identify the specific plans or pages requested for your bid.

For federal solicitations, review the provision titled 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids, according to Acquisition.gov. Bids may be withdrawn by written notice received at any time before the exact time set for bids, according to Acquisition.gov. If the IFB authorizes facsimile bids, bids may be withdrawn by facsimile received at any time before the exact time set for bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids, according to Acquisition.gov. Confirm the exact due time stated in your IFB before scheduling any withdrawal notice.

Check the bid bond authority under the provision titled 28.101-3 Authority of an attorney-in-fact for a bid bond, according to Acquisition.gov. Verify that the attorney-in-fact authority for the bid bond is valid and properly documented before submission.

Record the plan request details, the federal withdrawal cutoff time, and the bond authority status in your bid file. Mark each item as verified or unresolved before finalizing the submission package.

After review: jurisdiction marks before submission

The Minnesota Legislature Office of the Revisor of Statutes states that the solicitation document for any project shall state that any prime contractor or subcontractor or motor carrier that does not meet the minimum criteria in subdivision 3 or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the project or to perform work on the project, according to Minnesota Legislature Office of the Revisor of Statutes.

Review your marked entries before submission.

Illustrative example of six checklist marks

One solicitation has 6 checks. Mark 3 applicable, mark 2 unresolved, and mark 1 inapplicable. The 6 marks sit on one page. The 3 applicable marks are the ones the solicitation text covers. The 2 unresolved marks wait on a later reading. The 1 inapplicable mark stays on the page so the count still equals 6.

Next step

Take one current solicitation and fill in the checklist, marking each jurisdiction-specific entry applicable, inapplicable or unresolved. Read Public bid labor: 6 checks before you lock costs and Construction estimate audit: 5 inputs before a bid before you seal the package.

FAQ: sealed public construction bid submissions

What belongs on a sealed bid submission checklist?

A sealed bid submission checklist should include six specific checks: bidder training, contractor verification, responsibility determination, plan request record, submission provision, and bond authority. These items address distinct jurisdictional requirements that vary by agency and project type. Reviewing each item ensures the bid package meets the specific procedural and compliance standards stated in the applicable solicitation documents.

When is a federal bid due if the IFB gives no time?

If no time is specified in the Invitation for Bids, bids are due at 4:30 p.m., local time, for the designated Government office on the date that bids are due. Bidders should verify the designated Government office location to ensure timely submission according to Acquisition.gov.

Does the Minnesota verification requirement apply to every project or only projects covered by the cited section?

This requirement applies to projects covered by the section, not necessarily every public construction project. The solicitation document for any project covered by the cited section must state that a prime contractor, subcontractor, or motor carrier failing to meet minimum criteria or verify compliance is not a responsible contractor. The consequence for non-compliance is that the entity is not eligible to be awarded a construction contract for the project or to perform work on the project according to Minnesota Legislature Office of the Revisor of Statutes.

Can a bidder replace a power of attorney that the surety declares invalid?

If the surety declares the power of attorney to have been invalid, the contracting officer shall not allow the bidder to substitute a replacement power of attorney or a replacement surety, according to Acquisition.gov.